sml -Zedd

PRICE: $

 

PROVIDED : 

ALL RIGGING

ALL LED TILES  ( ROE CB5 DISPLAY - 5mm LED )

MEDIA SERVER & CONTENT

Challenges:  Limited load in time and rehearsal.

Outcome:  Ability to provide a row CB5 on air frames made for easy up and easy out.

SMALL CASE

ZEDD

Stage 1.jpg
Zedd__fillmore_6_033.jpg
Stage 3.jpg
Stage 4.jpg
Med -Futurola

PRICE: $$

 

PROVIDED : 

ALL RIGGING

PROVIDED ALL LED TILES - UNILUMIN  2mm LED

LED FLOOR  [ BRIGHT LOGIC 5mm INFERRED INTERACTIVE FLOOR w/ CUSTOM RAMPS ]

MEDIA SERVER & CONTENT

Challenges:  Freight logistics caused late arrival of gear. 

Outcome:  Brought in additional LED Floor techs to assist in build and show was on schedule and went off without a hitch.  Largest spectacle at trade show.

MEDIUM CASE

FUTUROLA

Futarolla_LED Floor+Wall_01.jpg
Brightlogic LED Floor Rig_web.jpg
Brightlogic LED Floor Rigged_web.jpg
Med -Kretek

PRICE:  $$

 

PROVIDED:

ALL RIGGING

ALL LED TILES  [ UNILUMIN - 2mm LED  ]

AUDIO

Challenge: Confirming all programming was correct to avoid any chance of panel swap of tiles in middle of show given the small space available at convention space.

MEDIUM CASE

KRETEK

NACS - Dryft_pg2-01-01.png
Double Sided Wall - 3D.jpg
IMG_1673_web.jpg
IMG_1867_web.jpg
LRG -Bunzl

PRICE:  $$$

 

PROVIDED:

ALL LIGHTING

ALL RIGGING

ALL LED TILES  [ UNILUMIN - 2mm LED w/ CUST 2mm CORNER LED TILES ]

MEDIA SERVER

PROCESSING

SWITCHING
GRAPHICS

PLAYBACK

4K BROADCAST CAMERAS

Rigging & weight challenges with 1000lbs per point limit created a very difficult and technical load in.  Caused by inaccurate  rigging dimensions provided by venue.  Regardless of challenges we completed ahead of schedule and it was one of their most spectacular national sales conferences to date.

LARGE CASE

BUNZLE

TRENDGROUP BENZLE .jpg
Bunzl-2019-PLAN-REV-A_Trend-01.png
Bunzl-2019-PLAN-REV-A_Trend-02-01.jpg
Bunzl-2019-PLAN-REV-A_Trend-03-01.jpg